Repair of a central road section going to the administrative and tourist center of the national park, 2009
Events, facts, documents and evidences: A section of the road from the village of Kamenyuki to the administrative and tourist center of the National Park "Belovezhskaya Pushcha" makes less than one kilometer. The quality of the pavement basically was satisfactory. Nevertheless, the plan of preparations for the 600th anniversary of Belovezhskaya Pushcha's nature protection provided for an overhaul this road section too.
The photos below show the road going to the administrative and tourist center of the national park before its repair.
1  |
2  |
(The road to the administrative and tourist center; 1 – July 11, 2005; 2 – December 04, 2004) |
The road overhaul included carriageways' asphalting, curb blocks' putting, sidewalks' tile paving and a special metal fence's installation along the length of the Pravaya Lesnaya River's flood-lands distance.
The road at time and after all basic works were complete is as seeing in the photos below.
 |
 |
| (The road at time of basic works; July 02, 2009) |
1  |
2  |
3  |
| (The road after all basic works were complete; 1 - August 2, 2009; 2 and 3 - September 06, 2009) |
| (Трубы для отвода дождевой воды; 1 и 2 - 6 сентября 2009 г.; 3 - 15 сентября 2009 г.) |
1  |
2  |
3  |
| (A rainwater canalization pipe; 1 and 2 - September 06, 2009; 3 - September 06, 2009) |
The photos below show last road works on earth adding, painting and rubbish cleaning.
 |
 |
 |
 |
| (Earth adding; September 15, 2009) |
 |
| (Fence painting; September 15, 2009) |
 |
| (Rubbish cleaning; September 15, 2009) |
The general view of the road after all works were complete is shown here.
 |
 |
 |
 |
| (The general view of the road after all works were complete; September 15, 2009) |
 |
| (A rubbish bin at the roadside; September 18, 2009) |
 |
 |
| (The general view of the road in late spring; November 14, 2009) |